Study 2014

90 pages

page 61-63 : 5.2.9. Lyon-Turin base tunnel – Timeline

The idea of building a base tunnel of a length of 50 km through the Alps to connect Lyon
and Turin by a fast train connection appeared for the first time in about 1989, when it was
promoted by the French side to extend their TGV network ….

Annex: Case Studies 2014

201 pages

 


Study 2013